Description
This contemporary and Elegant Techni Mobili TV stand, for TVs up to 75", is designed to fit any bedroom or family room. It includes three drawers and 3 shelves providing storage for your electronics and gaming accessories. Middle shelf has a back panel opening for cable management. The Techni Mobili TV cabinet is made of heavy duty compressed wood and laminate surface that is resistant to scratches. Important: Holds TV's up to 75" when TV is measure diagonally. Actual unit is 71" wide but TV overhang on either side is suitable. Weight capacity of 130 lbs.
Features:
- 3 drawers and 3 shelves
- Middle shelf with back panel opening for cord management
- Note: Holds TV's up to 75" when TV is measured diagonally. Actual unit is 71" wide but TV overhang on either side is suitable
Material: Compressed Wood
Dimensions: 70.75“W x 15.25“D x 20“H
- Width: 70.75 in.
- Depth: 15.25 in.
- Height: 20 in.
Weight: 93 lbs
Shipping
Shipping is typically through freight carriers. Shipping times depend on where you are located and which warehouse the order is being shipped from. Please allow 1-3 business days for the order to be shipped, and around 7 business days to arrive. Delivery details will be provided in your confirmation email along with a tracking number. If you order several items, you may receive multiple tracking numbers. Once the item has been shipped the freight service will reach out to you to coordinate the time and date of the delivery. If any accommodations need to be made, please note that at checkout and again when arranging the delivery appointment.
Orders will typically be dropped off either curbside or outside your front door. It is your responsibility to bring the furniture into the building and to remove any existing items.
Depending on the item, parts may be shipped in several boxes, and assembly may be required. Please check that you have all the pieces of the item and nothing is broken. If your order is damaged in transit and external damage is visible, note the damage immediately, write it down on the delivery documents, take photos and/or videos, and refuse the shipment. If there is no external damage, accept and sign for the package, but note "subject to concealed damage." Any damage upon delivery needs to be reported within 24 hours of delivery, or you may not be eligible for a refund. For more information about submitting claims, as well as incorrect item exchanges and replacement, please see our Refund Policy.
For more information about shipping please visit our complete Shipping Policy.
Techni Mobili Warranty
Warranty for Chairs
Task/Kid's Chairs: 1 Year Limited Warranty
Executive/Manager Chairs: 2 Year Limited Warranty
Desks: 5 Year Limited Warranty
Laptop Stands: 5 Year Limited Warranty
Bookshelves: 1 Year Limited Warranty
- RTA Products, LLC has warranted the Techni Mobili office chairs to the original purchaser who acquired a new product from RTA Products or its authorized resellers of the product against defects in material or workmanship.
- This warranty is expressly limited to the repair or replacement (at its option) of defective chair components or materials that fails under normal use as a result of a defect in materials or workmanship. This warranty is limited to merchandise purchased in the Continental United States. No assembly labor is included. The word "defects" as used in this warranty, is defined as imperfections that impair the utility of the product.
- This warranty applies under conditions of normal use, but does not apply to defects that result from intentional damage, negligence, unreasonable use or exposure.
- Liability for consequential damages is excluded to the extent exclusion is permitted by law. This warranty gives you specific legal rights, and you may have other rights that vary from State to State.
- RTA Products does not warrant: a) natural variations in character marks b) changes in surface finishes due to aging or exposure to light c) marks, scars, or wrinkles occurring naturally in leather d) failure resulting from normal wear and tear e) the matching of colors, grains, or textures of natural materials f) the colorfastness or the matching of textiles, including an exact match to cuttings or to swatch cards g) damage, marking, or staining of veneer surfaces due to contact with rubber or similar compounds, damage from sharp objects or imprinting from writing instruments, or prolonged exposure to direct sunlight h) we do not warrant products that are exposed to extreme environmental conditions or that have been subject to improper storage.
- RTA Products shall not be liable for loss of time, inconvenience, commercial loss, or incidental or consequential damages.
- Any modification to the original product voids the warranty. We do not warrant the performance of the product when used in combination with other than original products.
- This product has been designed for and is intended for office and home-office use only. This warranty is Original Purchaser’s sole remedy for product defects, and this warranty does not extend to any product, or damage to any product, caused by or attributed to abuse or misuse, products used for commercial or rental purposes, use modifications of, or attachments to the product, and products or parts not used, maintained, or extended hereunder is in lieu of any and all other warranties, express or implied, including without limitations any implied warranty or merchantability or of fitness for a particular purpose.
- Report any defects to RTA Products, LLC together with your sales receipt or other proof of purchase. If the chair is defective within the terms of the warranty, RTA Products, LLC will furnish a replacement chair (at its option) at no cost of equal or similar value and design.
- RTA Products will advise you of the procedure to follow in making warranty claims. The following are the procedures for warranty claims:
a) Call us Monday – Friday, from 9am-5pm (Eastern Time) at (866) 782-5520 to explain the defect and give your name, address and phone number. Please have ready the model number of our product, date and place of purchase. You can also write to us by e-mail to warranty@rtaproducts.com and include the same information.
b) If we determine that replacement will remedy the situation, and in order to determine the extent or the cause of the defect, purchaser will need to send the part in question at purchaser’s expense. Once we receive the part, we will examine it and determine whether the claim is valid (or not), and then proceed to send the replacement. We will ship the replacement at our expense.
Warranty for Desks
Desks/Laptop Carts & Stands/Filing Cabinets: Limited 5 Year Warranty
RTA Products, LLC warrants to the Original Purchaser who acquired a new product from RTA Products or its authorized resellers that this product will be free from defects in its workmanship and materials, under normal use and service conditions, as described herein. "Defects" as used in this warranty, is defined as any imperfections that impair the use of the furniture or product. RTA Products LLC will replace any defective part, at its discretion, and without charge to the original purchaser other than the freight from the end consumer to RTA Products.
Replacement parts can only be supplied if parts are available. Items out of production may be unavailable. This warranty will be effective for the applicable time period beginning the date of purchase on your original sales receipt. RTA product’s obligation under this warranty is limited to repairing or replacing products or parts as provided herein. This product has been designed for and is intended for office and home-office use only. This warranty is Original Purchaser’s sole remedy for product defects, and this warranty does not extend to any product, or damage to any product, caused by or attributed to abuse or misuse, products used for commercial or rental purposes, use modifications of, or attachments to the product, and products or parts not used, maintained, or extended hereunder is in lieu of any and all other warranties, express or implied, including without limitations any implied warranty or merchantability or of fitness for a particular purpose. Please note, all desks made with PVC Laminate surface should not be exposed to direct sunlight, as it may damage the material. Damage of this nature is not covered under this warranty.
RTA Products will not be responsible for indirect, special, incidental or consequential damages. This warranty is limited to merchandise purchased in the Continental United States. Some States do not allow the exclusion or limitation of incidental or consequential damages, so the above limitations or exclusions may not apply to you. This warranty gives you specific legal rights. You may also have other rights that may vary from state to state.
RTA Products will advise you of the procedure to follow in making warranty claims. The following are the procedures for warranty claims:
a. Call us Monday – Friday, from 9am-5pm (Eastern Time) at (866) 782-5520 to explain the defect and give your name, address and phone number. Please have ready the model number of our product, date and place of purchase. You can also write to us by e-mail to warranty@rtaproducts.com and include the same information.
b. If we determine that replacement will remedy the situation, and in order to determine the extent or the cause of the defect, purchaser will need to send the part in question at purchaser’s expense. Once we receive the part, we will examine it and determine whether the claim is valid (or not), and then proceed to send the replacement. We will ship the replacement at our expense.
Warranty for TV StandsTV Stands/Entertainment Centers: 2 Year Warranty
RTA Products, LLC warrants to the Original Purchaser who acquired a new product from RTA Products or its authorized resellers that this product will be free from defects in its workmanship and materials, under normal use and service conditions, as described herein. "Defects" as used in this warranty, is defined as any imperfections that impair the use of the furniture or product. RTA products will repair or replace, at is option, without charge to the original purchaser ‘other than freight from purchaser to RTA Products, only the defective products or parts for a period of TWO (2) Years.
Replacement parts can only be supplied if parts are available. Items out of production may be unavailable. This warranty will be effective for the applicable time period beginning the date of purchase on your original sales receipt. RTA product’s obligation under this warranty is limited to repairing or replacing products or parts as provided herein. This product has been designed for and is intended for office and home-office use only. This warranty is Original Purchaser’s sole remedy for product defects, and this warranty does not extend to any product, or damage to any product, caused by or attributed to abuse or misuse, products used for commercial or rental purposes, use modifications of, or attachments to the product, and products or parts not used, maintained, or extended hereunder is in lieu of any and all other warranties, express or implied, including without limitations any implied warranty or merchantability or of fitness for a particular purpose. Please note, all desks made with PVC Laminate surface should not be exposed to direct sunlight, as it may damage the material. Damage of this nature is not covered under this warranty.
RTA Products will not be responsible for indirect, special, incidental or consequential damages. This warranty is limited to merchandise purchased in the Continental United States. Some States do not allow the exclusion or limitation of incidental or consequential damages, so the above limitations or exclusions may not apply to you. This warranty gives you specific legal rights. You may also have other rights that may vary from state to state.
RTA Products will advise you of the procedure to follow in making warranty claims. The following are the procedures for warranty claims:
a. Call us Monday – Friday, from 9am-5pm (Eastern Time) at (866) 782-5520 to explain the defect and give your name, address and phone number. Please have ready the model number of our product, date and place of purchase. You can also write to us by e-mail to warranty@rtaproducts.com and include the same information.
b. If we determine that replacement will remedy the situation, and in order to determine the extent or the cause of the defect, purchaser will need to send the part in question at purchaser’s expense. Once we receive the part, we will examine it and determine whether the claim is valid (or not), and then proceed to send the replacement. We will ship the replacement at our expense.
Guaranteed Safe and Secure Checkout
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.











